Skip to content

In-Pool Lounge Chair Ergonomic S-Curve HDPE Pool Chaise Lounger with Wheels-

Current price £144.99
Original price £230.99
Original price £230.99 - Original price £230.99
Original price £230.99
£144.99 - £144.99
Current price £144.99
tags icon FREE 1-2 Day Tracked Delivery   tags icon  Easy 30 Day Returns  
in stock
in stock
Option: Black

Dispatch & Delivery

FREE 1-2 Day UK Tracked Delivery.

Dispatches within 24 hours.

30-day returns

Enjoy 30 day returns as standard.

Rated Excellent on Trustpilot

Committed to outstanding customer service.

Pay securely, your way

Product Description:

The built-in rear wheels make repositioning this patio lounge chair incredibly simple around your garden or pool, and the waterproof surface ensures low maintenance daily care. You can lye comfortably for hours since the ergonomic S-curve design beautifully mimics the natural human spine shape for full-body support. Crafted from weather-resistant HDPE, the poolside lounger endures harsh environmental elements without fading or cracking under intense daily sunlight. Moreover, this firm 21kg self-weighted sun shelf chair securely sits in waters between 14.5-22 cm deep, confidently supporting a weight capacity of up to a full 205kg. Outdoor Element Defense: This pool lounge chair, crafted from HDPE and 304 stainless steel hardware, is built to endure outdoor elements. It resists fading, peeling and cracking in intense sun exposure. Highly enduring by design, it is chlorine- and saltwater-friendly, ensuring lasting performance by the pool without rust. Stable Weighted Structure: The pool lounger weighs a solid 46.5 lbs, providing reliable self-weighted stability. It will stay in place without the hassle of filling heavy sandbags. Engineered for sun shelves and shallow pools with a recommended water depth between 14.5-22 cm, it offers a semi-submerged cooling comfort. Ergonomic Curve Support: Featuring an ergonomic S-curve profile, this in-pool chair beautifully mimics the natural human body shape for deep relaxation. This precise contouring delivers full-body support for your back, lumbar, and legs. It significantly minimizes fatigue, allowing you to sunbathe or read comfortably for hours. Reliable Weight Support: With a robust frame and widened structural beams, this pool chaise lounge boasts a weight capacity of up to 205kg. The spacious seating area easily accommodates multiple body types, providing a wobble-free lounging experience whether you relax in or out of the water. Easy Mobility Wheels: Equipped with 2 smooth-rolling rear wheels, moving this sun lounger around your deck, garden or out of the pool is effortless. Plus, the waterproof surface requires low maintenance, making daily cleaning easy. You just rinse it with a hose or wipe it down with a soft cloth to wash away dirt and splashes.

Color: Black/Brown Material: HDPE Overall Dimensions: 163 x 55 x 64 cm (L x W x H) Recommended Water Depth: 14.5-22 cm Net Weight: 21 kg Weight Capacity: 205 kg   Package Includes 1 x In-Pool Lounge Chair 1 x User Manual Is Assembly Required: Yes Box QTY: 1(May vary by batch)

Questions & Answers

Have a Question?

Be the first to ask a question about this.

Ask a Question
Shop Thousands of Products

In stock and ready to dispatch.

Easy 30 Day Returns

Easily manage returns via your account.

Free Tracked Delivery

Spend £15 or more to qualify.

A+ Customer Support

We’re committed to great service.